Executive design and working operations needed to realize the new high level containment facility (ISO7HC) designed for Exomars project. Supply and installation of a self-supporting carpentry structure, movable walls, false ceilings, HVAC system, electrical panels, lighting, hot air sterilizer, fire protection system, fire detection system, particle monitoring system.
The solution is the perfect joint for that system