The design process developed according to ISO 9001/2008 certified quality system is completed with a conformity clearance to the reference regulations and guidelines.

Acotec method can be summarized in the following activities:
  • analysis of production processes and products
  • definition of the layout, paying attention to the routes of operators, materials and final products
  • definition of contamination classes according to international standards
  • conformity clearance to regulations and guidelines
  • evaluation of investment costs
  • evaluation of design and construction time
  • final and executive design of the structure, systems, and monitoring systems
  • building construction and plant technology
  • possible supply and installation of specific equipments
  • creation of maintenance handbooks and certifications according to reference regulations
3D design drawings permit to visualize the final result.