The design process developed according to
ISO 9001/2008 certified quality system is completed with a conformity clearance to the reference regulations and guidelines.
Acotec method can be summarized in the following activities:
- analysis of production processes and products
- definition of the layout, paying attention to the routes of operators, materials and final products
- definition of contamination classes according to international standards
- conformity clearance to regulations and guidelines
- evaluation of investment costs
- evaluation of design and construction time
- final and executive design of the structure, systems, and monitoring systems
- building construction and plant technology
- possible supply and installation of specific equipments
- creation of maintenance handbooks and certifications according to reference regulations
3D design drawings permit to visualize the final result.